Adana Metro logo

Line 1

Adana Metro
Metro 13.5 km

Line 1 Stations (0)

Hastane
Anadolu Lisesi
Huzurevi
Mavi Bulvar
Yurt
Yeşilyurt
Fatih
Vilayet
İstiklal
Kocavezir
Hürriyet
Cumhuriyet
Akıncılar

Line 1 Info

  • Network Adana Metro
  • Operation Started 2010
  • Total Length 13.5 km
  • Total Stations 13

Terminals

From Hastane
To Akıncılar

Line 1 Overview

Construction of Adana Metro Line 1 began in 1990, and some service began in March 2009, with the full line officially opening on May 14, 2010. The line is 13.9 kilometers long and has 13 stations, running through central Adana from Hasten to Akıncılar. The line connects important areas of the city, including the city center, the railway station area, and the Yüreğir Bus Terminal, and provides links to local bus services within Adana.

Adana Metro Map 2026

Adana Metro map
Click to expand

Frequently Asked Questions — Line 1

Line 1 has 13 stations on the Adana Metro network.

Line 1 runs between Hastane and Akıncılar.

Line 1 is approximately 13.5 km long.

Line 1 opened in 2010.

Line 1 is a Metro line operated under Adana Metro.

Line 1 is part of the Adana Metro transit network.