Green Line Info
- Network Baku Metro
- Total Length 12.2 km
- Total Stations 17
Terminals
From
Darnagul
To
Halglar Doslugu
Green Line Overview
The main branch of the Green Line runs from Darnagul to Hazi Aslanov. Opened in phases since the late 1970 and extended until 2011, this section is approximately 12.2 km long, with 8 stations and interchanges with the Red Line at major hubs such as May 28.
Baku Metro Map 2026
Click to expand
Other Lines in Baku Metro
Frequently Asked Questions — Green Line
Green Line has 17 stations on the Baku Metro network.
Green Line runs between Darnagul and Halglar Doslugu.
Green Line is approximately 12.2 km long.
Green Line is a Metro line operated under Baku Metro.
Green Line is part of the Baku Metro transit network.