Belo Horizonte Metro logo
Metro 28.1 km

Line 1 Stations (0)

Eldorado
Cidade Industrial
Vila Oeste
Gameleira
Calafate
Carlos Prates
Lagoinha
Central
Santa Efigênia
Santa Tereza
Horto
Santa Inês
José C. Silveira
Minas Shopping
São Gabriel
1° de Maio
Waldomiro Lobo
Floramar
Vilarinho

Line 1 Info

Terminals

From Eldorado
To Vilarinho

Line 1 Overview

Line 1 of the Belo Horizonte Metro is the only operational line, running between Eldorado and Vilarinho. The approximately 28.1 km long line has 19 stations and was opened on August 1, 1986. Its expansion was completed in phases until 2002. It is the main rapid transit corridor of Belo Horizonte, passing through the city center and major stations such as Central.

Belo Horizonte Metro Map 2026

Belo Horizonte Metro map
Click to expand

Frequently Asked Questions — Line 1

Line 1 has 19 stations on the Belo Horizonte Metro network.

Line 1 runs between Eldorado and Vilarinho.

Line 1 is approximately 28.1 km long.

Line 1 opened in 1986.

Line 1 is a Metro line operated under Belo Horizonte Metro.

Line 1 is part of the Belo Horizonte Metro transit network.