Changchun Subway logo
Metro 24.9 km

Line 2 Stations (0)

Qiche Gongyuan
Jieda Avenue
West Lake
Shuangfeng
Changchun West Railway Station
Xinglongpu
West Ring Road
Heping Street
Wanfu Street
Jingyang Square
Jiefang Overpass
Jianshe Square
Wenhua Square
Jiefang Avenue
Pingyang Street
Nanguan
Jilin Avenue
Dongsheng Street
East Ring Road
Changqing
Dongfang Square

Line 2 Info

  • Network Changchun Subway
  • Operation Started 2018
  • Total Length 24.9 km
  • Total Stations 21

Terminals

From Qiche Gongyuan
To Dongfang Square

Line 2 Overview

Changchun Rail Transit Line 2 was inaugurated on August 30, 2018, running between Shuangfeng and Dongfang Square; initially 20.5 km long and now extended to 24.9 km, it has 21 stations, and operates as a fully underground east-west rapid transit metro line connecting major urban areas and interchange stations.

Changchun Subway Map 2026

Changchun Subway map
Click to expand

Frequently Asked Questions — Line 2

Line 2 has 21 stations on the Changchun Subway network.

Line 2 runs between Qiche Gongyuan and Dongfang Square.

Line 2 is approximately 24.9 km long.

Line 2 opened in 2018.

Line 2 is a Metro line operated under Changchun Subway.

Line 2 is part of the Changchun Subway transit network.