Line 3 Info
- Network Guiyang Metro
- Operation Started 2023
- Total Length 43.0 km
- Total Stations 29
Terminals
From
Tongmuling (Party School of the CPC Guizhou Provincial Committee)
To
Luowan
Line 3 Overview
Line 3 began operation on December 16, 2023, and is approximately 43.0 kilometers long, with 29 stations. The line runs from Tongmuling to Luowan and passes through districts such as Huaxi, Nanming, Yunyan, and Wudang. It features interchanges at major stations such as Beijing Road (Line 1), West Yan'an Road (Line 2), and Zhongcaosi (Line S1).
Guiyang Metro Map 2026
Click to expand
Other Lines in Guiyang Metro
Frequently Asked Questions — Line 3
Line 3 has 29 stations on the Guiyang Metro network.
Line 3 runs between Tongmuling (Party School of the CPC Guizhou Provincial Committee) and Luowan.
Line 3 is approximately 43.0 km long.
Line 3 opened in 2023.
Line 3 is a Metro line operated under Guiyang Metro.
Line 3 is part of the Guiyang Metro transit network.