Line 2A Overview
Construction of Hanoi Metro Line 2A began in 2011 and opened to the public on November 6, 2021. The line is 13.1 kilometers long, with 12 stations between Cat Linh and Yen Nghia. Also known as the Cat Linh-Ha Dong Line, it connects central Hanoi with the southwestern districts of Thanh Xuan and Ha Dong. The line also connects to bus rapid transit routes and future Hanoi Metro lines planned throughout the city.