Line 1 Info
- Network Lanzhou Metro
- Operation Started 2019
- Total Length 25.9 km
- Total Stations 20
Terminals
From
Chenguanying
To
Donggang
Line 1 Overview
Line 1 of the Lanzhou Metro is the city's first metro line. Construction began in 2012, and the line opened on June 23, 2019. It runs between Chenghuanying and Donggang. The approximately 25.9-kilometer line has a total of 20 stations. It is also notable for being the first metro line in China to tunnel under the Yellow River.
Lanzhou Metro Map 2026
Click to expand
Other Lines in Lanzhou Metro
Frequently Asked Questions — Line 1
Line 1 has 20 stations on the Lanzhou Metro network.
Line 1 runs between Chenguanying and Donggang.
Line 1 is approximately 25.9 km long.
Line 1 opened in 2019.
Line 1 is a Metro line operated under Lanzhou Metro.
Line 1 is part of the Lanzhou Metro transit network.