Line 1 Overview
Line 1 of the Luoyang Metro is the city's first metro line. Construction began in 2017, and the line opened on March 28, 2021. It runs between Hongshan and Yangwan. The line is approximately 25.3 kilometers long and has a total of 19 stations. It operates as an east-west corridor in Luoyang and includes an interchange with Line 2 at Jiefang Road Station.