Nanjing Metro logo

Line 1

Nanjing Metro
Metro 45.4 km

Line 1 Stations (0)

Baguazhoudaqiaonan
Badoushan
Yanziji
Jixiang'an
Xiaozhuang
Maigaoqiao
Hongshan Zoo
Nanjing Railway Station
Xinmofan­malu
Xuanwumen
Gulou
Zhujianglu
Xinjiekou
Zhangfuyuan
Sanshanjie
Zhonghuamen
Andemen
Tianlongsi
Ruanjian­dadao
Huashenmiao
Nanjing South Railway Station
Shuanglong­dadao
Hedingqiao
Shengtailu
Baijiahu
Xiaolongwan
Zhushanlu
Tianyin­dadao
Longmian­dadao
NMU / JIETT
NJCI
CPU

Line 1 Info

  • Network Nanjing Metro
  • Operation Started 2005
  • Total Length 45.4 km
  • Total Stations 32

Terminals

From Baguazhoudaqiaonan
To CPU

Line 1 Overview

Line 1 of the Nanjing Metro opened on September 3, 2005, and has been subsequently extended, including a major southern extension in 2010 and a northern extension in 2022. This line runs between Baguazhouda Qiaonan and China Pharmaceutical University (CPU). It is approximately 45.4 kilometers long and has 32 stations. The route runs in a north-south direction and passes through major districts such as Qixia, Gulou, Qinhuai, and Jiangning.

Nanjing Metro Map 2026

Nanjing Metro map
Click to expand

Frequently Asked Questions — Line 1

Line 1 has 32 stations on the Nanjing Metro network.

Line 1 runs between Baguazhoudaqiaonan and CPU.

Line 1 is approximately 45.4 km long.

Line 1 opened in 2005.

Line 1 is a Metro line operated under Nanjing Metro.

Line 1 is part of the Nanjing Metro transit network.