Line 1 Info
- Network Nanjing Metro
- Operation Started 2005
- Total Length 45.4 km
- Total Stations 32
Terminals
From
Baguazhoudaqiaonan
To
CPU
Line 1 Overview
Line 1 of the Nanjing Metro opened on September 3, 2005, and has been subsequently extended, including a major southern extension in 2010 and a northern extension in 2022. This line runs between Baguazhouda Qiaonan and China Pharmaceutical University (CPU). It is approximately 45.4 kilometers long and has 32 stations. The route runs in a north-south direction and passes through major districts such as Qixia, Gulou, Qinhuai, and Jiangning.
Nanjing Metro Map 2026
Click to expand
Other Lines in Nanjing Metro
Frequently Asked Questions — Line 1
Line 1 has 32 stations on the Nanjing Metro network.
Line 1 runs between Baguazhoudaqiaonan and CPU.
Line 1 is approximately 45.4 km long.
Line 1 opened in 2005.
Line 1 is a Metro line operated under Nanjing Metro.
Line 1 is part of the Nanjing Metro transit network.