Line 2 Info
- Network Nanning Metro
- Operation Started 2017
- Total Length 27.3 km
- Total Stations 23
Terminals
From
Xijin
To
Tanze
Line 2 Overview
Line 2 runs between Zijin and Tangze, with the extension completed on November 23, 2020. The line is approximately 27.5 kilometers long and has a total of 23 stations. It forms the north-south corridor of Nanning and includes interchange stations such as Nanning Railway Station and Chaoyang Square, where it connects with Line 1.
Nanning Metro Map 2026
Click to expand
Other Lines in Nanning Metro
Frequently Asked Questions — Line 2
Line 2 has 23 stations on the Nanning Metro network.
Line 2 runs between Xijin and Tanze.
Line 2 is approximately 27.3 km long.
Line 2 opened in 2017.
Line 2 is a Metro line operated under Nanning Metro.
Line 2 is part of the Nanning Metro transit network.