Qingdao Metro logo

Line 1

Qingdao Metro
Metro 59.8 km

Line 1 Stations (0)

Wangjiagang
China University of Petroleum
Taihangshan Road
Jinggangshan Road
Dingjiahe
Xuejiadao
Tianmushan Road
Anzi
Xingangshan Road
Nanbeitun
Shanli
Fenghuangdao
Tuandao
Xizhen
Qingdao Railway Station
Zhongshan Road
Guanxiangshan (Qingdao Municipal Hospital)
Guangrao Road
Taidong
Haipo Bridge (Hiser Hospital)
Xiaocunzhuang
Beiling
Shuiqinggou
Qingdao Central Hospital
Shengli Bridge (Textile Valley)
Anshun Road
Qingdao North Railway Station
Cang'an Road
Yongnian Road
Xingguo Road
Nanling
Zunyi Road
Ruijin Road
Xianjiazhai (North Coach Station)
Liuting
Fenggang Road
Xiaozhaizi
Zhengyang Middle Road
Qingdao Agricultural University
Goucha
Dongguozhuang

Line 1 Info

  • Network Qingdao Metro
  • Operation Started 2020
  • Total Length 59.8 km
  • Total Stations 41

Terminals

From Wangjiagang
To Dongguozhuang

Line 1 Overview

Line 1 of the Qingdao Metro opened in phases on December 24, 2020, with the northern section between Wangjiagang and Shanliang becoming operational first. Construction of the entire line was completed in 2021. It runs between Wangjiagang and Xianggangdong Road. The line is approximately 59.8 kilometers long and has a total of 41 stations. The section between Xingguo Road and Dongguozhuang is planned to be separated from Line 1 in the future and incorporated into Phase 1 of Line 7.

Qingdao Metro Map 2026

Qingdao Metro map
Click to expand

Frequently Asked Questions — Line 1

Line 1 has 41 stations on the Qingdao Metro network.

Line 1 runs between Wangjiagang and Dongguozhuang.

Line 1 is approximately 59.8 km long.

Line 1 opened in 2020.

Line 1 is a Metro line operated under Qingdao Metro.

Line 1 is part of the Qingdao Metro transit network.