- Network Salvador Metro
- Operation Started 2014
- Total Length 13.4 km
- Total Stations 9
Terminals
From
Lapa
To
Campinas
Line 1 Overview
The first phase of Salvador Metro Line 1, "Lapa"–"Aceso Norte," opened for public service on June 11, 2014. The line was extended in separate sections to "Piraja" and later to "Aguas Claras," covering approximately 17 km and having 10 stations. It forms the system's starting corridor and interchanges with Line 2 at Aceso Norte.
Salvador Metro Map 2026
Click to expand
Other Lines in Salvador Metro
Frequently Asked Questions — Line 1
Line 1 has 9 stations on the Salvador Metro network.
Line 1 runs between Lapa and Campinas.
Line 1 is approximately 13.4 km long.
Line 1 opened in 2014.
Line 1 is a Metro line operated under Salvador Metro.