Shaoxing Metro logo
Metro 47.1 km

Line 1 Stations (0)

Guniangqiao
Yaqian
Yangxunqiao
Qianmei
Qianqing
Xisha Road
Linhang Avenue
Jianshui Road
Yuezhou Avenue
China Textile City
Mingzhu Square
Guazhuhu
Jingshui Road
Huangjiu Town
Zhangshu
Olympic Sports Center
Meishan Square
Fenglin
Datan
Railway Station
City Square
Lu Xun Native Place
Chengnan Avenue
Fenghuangshan
Laojiafeng
Nanchi
Qihu
Fangquan

Line 1 Info

  • Network Shaoxing Metro
  • Operation Started 2021
  • Total Length 47.1 km
  • Total Stations 28

Terminals

From Guniangqiao
To Fangquan

Line 1 Overview

The main line of Line 1 was opened in phases. The first phase, between Gunjiangqiao and China Textile City, opened on June 28, 2021, while the remaining sections opened on April 29, 2022. The line currently runs between Gunjiangqiao and Fangquan. It is approximately 47.1 kilometers long and has 28 stations. The line connects Keqiao District and Yuecheng District and also provides interchange connectivity with Hangzhou Metro Line 5 at Gunjiangqiao Station.

Shaoxing Metro Map 2026

Shaoxing Metro map
Click to expand

Other Lines in Shaoxing Metro

Line 2

Frequently Asked Questions — Line 1

Line 1 has 28 stations on the Shaoxing Metro network.

Line 1 runs between Guniangqiao and Fangquan.

Line 1 is approximately 47.1 km long.

Line 1 opened in 2021.

Line 1 is a Metro line operated under Shaoxing Metro.

Line 1 is part of the Shaoxing Metro transit network.