Line 1 Info
- Network Tabriz Metro
- Operation Started 2015
- Total Length 17.2 km
- Total Stations 12
Terminals
From
El Goli
To
Noor
Line 1 Overview
The first phase of Line 1 opened on August 27, 2015. The line is 7 kilometers long between Al Goli and Ustad Shahriar and has six stations. In 2016, the line was extended westward to Maidan-e Sa'at. The last major extension was completed in February 2020, making the line 17.2 kilometers long from Al Goli to Noor and serving 12 stations.
Tabriz Metro Map 2026
Click to expand
Frequently Asked Questions — Line 1
Line 1 has 12 stations on the Tabriz Metro network.
Line 1 runs between El Goli and Noor.
Line 1 is approximately 17.2 km long.
Line 1 opened in 2015.
Line 1 is a Metro line operated under Tabriz Metro.
Line 1 is part of the Tabriz Metro transit network.