Green line Info
- Network Taichung Metro
- Operation Started 2021
- Total Length 16.7 km
- Total Stations 18
Terminals
From
Beitun Main
To
HSR Taichung station
Green line Overview
The Green Line began trial operation on 16 November 2020 and was scheduled to formally commence operation on 19 December 2020. The line runs between Beitun Main Station and High Speed Rail Taichung Station and is developed as the Wuri–Wenxin–Beitun Line. The line is 16.7 kilometers long and has 18 stations. It also provides transfer facilities to Taiwan Railways services at Songzhou and Daqing stations, as well as connectivity to Taiwan High Speed Rail at High Speed Rail (HSR) Taichung station.
Taichung Metro Map 2026
Click to expand
Frequently Asked Questions — Green line
Green line has 18 stations on the Taichung Metro network.
Green line runs between Beitun Main and HSR Taichung station.
Green line is approximately 16.7 km long.
Green line opened in 2021.
Green line is a Metro line operated under Taichung Metro.
Green line is part of the Taichung Metro transit network.