Green line

Taichung Metro
Metro 16.7 km

Green line Stations (0)

Beitun Main
Jiushe
Songzhu
Sihwei Elementary School (Erfenpu)
Wenxin Chongde
Wenxin Zhongqing (Tianjin Shopping Distrist)
Wenhua Senior High School
Wenxin Yinghua
Taichung City Hall
Shui-an Temple
Wenxin Forest Park
Nantun (Wenxin Wuquan W.)
Feng-le Park
Daqing (Chung Shan Medical University)
Jiuzhangli
Jiude
Wuri
HSR Taichung station

Green line Info

  • Network Taichung Metro
  • Operation Started 2021
  • Total Length 16.7 km
  • Total Stations 18

Terminals

From Beitun Main
To HSR Taichung station

Green line Overview

The Green Line began trial operation on 16 November 2020 and was scheduled to formally commence operation on 19 December 2020. The line runs between Beitun Main Station and High Speed Rail Taichung Station and is developed as the Wuri–Wenxin–Beitun Line. The line is 16.7 kilometers long and has 18 stations. It also provides transfer facilities to Taiwan Railways services at Songzhou and Daqing stations, as well as connectivity to Taiwan High Speed Rail at High Speed Rail (HSR) Taichung station.

Taichung Metro Map 2026

Taichung Metro map
Click to expand

Frequently Asked Questions — Green line

Green line has 18 stations on the Taichung Metro network.

Green line runs between Beitun Main and HSR Taichung station.

Green line is approximately 16.7 km long.

Green line opened in 2021.

Green line is a Metro line operated under Taichung Metro.

Green line is part of the Taichung Metro transit network.