Line S1 Overview
Line S1 began operation on December 28, 2022, between Taizhou Railway Station and Chengnan. The line is 52.4 kilometers long and has 15 stations, including both underground and elevated sections. Construction began in November 2016, connecting Taizhou Railway Station and Wenling Railway Station. It was constructed as part of the first phase of Taizhou's rail transportation plan, with future interchange support planned for upcoming lines such as Line S2.
Taizhou Metro Map 2026
Click to expand
Frequently Asked Questions — Line S1
Line S1 has 15 stations on the Taizhou Metro network.
Line S1 runs between Taizhou Huochezhan and Chengnan.
Line S1 is approximately 52.4 km long.
Line S1 opened in 2022.
Line S1 is a Metro line operated under Taizhou Metro.
Line S1 is part of the Taizhou Metro transit network.