Yerevan Metro logo

Line 1

Yerevan Metro
Metro 13.4 km

Line 1 Stations (0)

Barekamutyun
Marshal Baghramyan
Yeritasardakan
Republic Square
Zoravar (General) Andranik
David of Sasun
Gortsaranain
Shengavit
Garegin Nzhdeh Square
Charbakh

Line 1 Info

  • Network Yerevan Metro
  • Operation Started 1981
  • Total Length 13.4 km
  • Total Stations 10

Terminals

From Barekamutyun
To Charbakh

Line 1 Overview

Yerevan Metro Line 1 is the system's only line and opened on March 7, 1981. It runs from Barekamutyun to Charbakh, covering a distance of 13.4 kilometers and serving 10 stations. Built during the Soviet era, the line runs mostly north-south and includes both underground and elevated sections, showcasing the city's hilly terrain. Most stations were opened in the 1980, while the final extension to Charbakh was completed in 1996.

Yerevan Metro Map 2026

Yerevan Metro map
Click to expand

Frequently Asked Questions — Line 1

Line 1 has 10 stations on the Yerevan Metro network.

Line 1 runs between Barekamutyun and Charbakh.

Line 1 is approximately 13.4 km long.

Line 1 opened in 1981.

Line 1 is a Metro line operated under Yerevan Metro.

Line 1 is part of the Yerevan Metro transit network.