Caracas Metro logo

Line 1

Caracas Metro
Metro 20.4 km

Line 1 Stations (0)

Propatria
Pérez Bonalde
Plaza Sucre
Gato Negro
Agua Salud
Caño Amarillo
Capitolio
La Hoyada
Parque Carabobo
Bellas Artes
Colegio de Ingenieros
Plaza Venezuela
Sabana Grande
Chacaíto
Chacao
Altamira
Miranda
Los Dos Caminos
Los Cortijos
La California
Petare
Palo Verde

Line 1 Info

  • Network Caracas Metro
  • Operation Started 1983
  • Total Length 20.4 km
  • Total Stations 22

Terminals

From Propatria
To Palo Verde

Line 1 Overview

Line 1 runs between Propatria and Palo Verde. The first phase of the line opened on January 2, 1983, between Propatria and La Hoyada, followed by extensions to Chacaito in 1983, Los Dos Caminos in 1988, and Palo Verde in 1989. The line is 20.4 kilometers long and has 22 stations. The line provides interchange with lines 2, 3 and 4, as well as connections to regional rail and bus services.

Caracas Metro Map 2026

Caracas Metro map
Click to expand

Frequently Asked Questions — Line 1

Line 1 has 22 stations on the Caracas Metro network.

Line 1 runs between Propatria and Palo Verde.

Line 1 is approximately 20.4 km long.

Line 1 opened in 1983.

Line 1 is a Metro line operated under Caracas Metro.

Line 1 is part of the Caracas Metro transit network.