Changsha Metro logo
Metro 22.5 km

Line 5 Stations (0)

Maozhutang
Bantangchong
Datang
Yuhua District Government
Muqiao
Guitang
South Gaoqiao
North Gaoqiao
Furong District Government
Wanjiali Square
Mawangdui
Huojucun
Yazipu
Malanshan
North Yuehu Park
Baimaopu
Tuqiao
Shuiduhe

Line 5 Info

  • Network Changsha Metro
  • Operation Started 2020
  • Total Length 22.5 km
  • Total Stations 18

Terminals

From Maozhutang
To Shuiduhe

Line 5 Overview

The first phase of Changsha Metro Line 5, which runs between Maozhutang and Shuiduhe and is 22.5 kilometers long and has 18 stations, was opened to the public on June 28, 2020, and includes interchange stations with other lines, forming an important north-south corridor in the eastern part of the network.

Changsha Metro Map 2026

Changsha Metro map
Click to expand

Frequently Asked Questions — Line 5

Line 5 has 18 stations on the Changsha Metro network.

Line 5 runs between Maozhutang and Shuiduhe.

Line 5 is approximately 22.5 km long.

Line 5 opened in 2020.

Line 5 is a Metro line operated under Changsha Metro.

Line 5 is part of the Changsha Metro transit network.