Chengdu Metro logo

Line 17

Chengdu Metro
Metro 6.4 km

Line 17 Stations (0)

Jitouqiao
Baifoqiao
Jiujiang North

Line 17 Info

  • Network Chengdu Metro
  • Operation Started 2020
  • Total Length 6.4 km
  • Total Stations 3

Terminals

From Jitouqiao
To Jiujiang North

Line 17 Overview

Chengdu Metro Line 17 was inaugurated on December 18, 2020. The line runs between Jinxing and Jitouqiao. It is 26.15 kilometers long and has nine stations in the first phase. The second phase will extend the line westward to Gaohong, bringing its total length to approximately 50.9 kilometers. After full integration, it will become a rapid express corridor passing through Wenjiang, central Chengdu and Wuhou District, with interchange connections to Line 4, Line 9 and Line 19.

Chengdu Metro Map 2026

Chengdu Metro map
Click to expand

Frequently Asked Questions — Line 17

Line 17 has 3 stations on the Chengdu Metro network.

Line 17 runs between Jitouqiao and Jiujiang North.

Line 17 is approximately 6.4 km long.

Line 17 opened in 2020.

Line 17 is a Metro line operated under Chengdu Metro.

Line 17 is part of the Chengdu Metro transit network.