Line 6 Info
- Network Chengdu Metro
- Operation Started 2020
- Total Length 68.9 km
- Total Stations 56
Terminals
From
Wangcong Temple
To
Lanjiagou
Line 6 Overview
Chengdu Metro Line 6 was inaugurated on December 18, 2020. It runs between Wangkong Temple and Lanjiagou, covering a length of 68.88 kilometers and consisting of 56 stations. Interchanges are located at Wangkong Temple, Xipu Railway Station, Southwest Jiaotong University, Renmin North Road, Niuwangmiao, Dongguang, Liulichang, Jinshi Road, Financial City East, Qinhuangsi, and Huilong.
Chengdu Metro Map 2026
Click to expand
Other Lines in Chengdu Metro
Line 1
Weijianian ↔ Science City
Line 10
Taipingyuan ↔ Xinping
Line 17
Jitouqiao ↔ Jiujiang North
Line 18
South Railway Station ↔ Tianfu International Airport North
Line 19
Jinxing ↔ Tianfu Station
Line 2
Xipu ↔ Longquanyi
Line 3
Chengdu Medical College ↔ Shuangliu Square
Line 4
Line 5
Line 7
Fuqing Road ↔ Chengdu University of Technology
Line 8
Shilidian ↔ Lianhua
Line 9
Financial City East ↔ Huangtianba
Frequently Asked Questions — Line 6
Line 6 has 56 stations on the Chengdu Metro network.
Line 6 runs between Wangcong Temple and Lanjiagou.
Line 6 is approximately 68.9 km long.
Line 6 opened in 2020.
Line 6 is a Metro line operated under Chengdu Metro.
Line 6 is part of the Chengdu Metro transit network.