Copenhagen Metro logo
Metro 15.5 km

M3 Line Stations (0)

København H
Enghave Plads
Frederiksberg Allé
Aksel Møllers Have
Nuuks Plads
Nørrebros Runddel
Nørrebro
Skjolds Plads
Vibenshus Runddel
Poul Henningsens Plads
Trianglen
Østerport
Marmorkirken
Gammel Strand
Rådhuspladsen

M3 Line Info

  • Network Copenhagen Metro
  • Operation Started 2019
  • Total Length 15.5 km
  • Total Stations 15

Terminals

From København H
To Rådhuspladsen

M3 Line Overview

The M3 line is a loop line of the Copenhagen Metro. The network has a total length of 15.5 kilometers and 17 stations. The line opened on September 29, 2019. It connects major hubs such as Copenhagen Central Station, Nørreport, Østerport, and Frederiksberg, connecting to other metro and rail services.

Copenhagen Metro Map 2026

Copenhagen Metro map
Click to expand

Frequently Asked Questions — M3 Line

M3 Line has 15 stations on the Copenhagen Metro network.

M3 Line runs between København H and Rådhuspladsen.

M3 Line is approximately 15.5 km long.

M3 Line opened in 2019.

M3 Line is a Metro line operated under Copenhagen Metro.

M3 Line is part of the Copenhagen Metro transit network.