MRT Putrajaya Line Stations (36)
MRT Putrajaya Line Info
- Network Kuala Lumpur Rapid Rail
- Operation Started 2022
- Total Length 57.7 km
- Total Stations 36
Terminals
From
Kwasa Damansara
MRT Putrajaya Line Overview
The Putrajaya Line is the second-longest mass rapid transit line. Its first phase, which is 27 kilometers long from Kwasa Damansara to Kambong Batu and includes 24 stations, was opened to the public on June 16, 2022, after testing. The second phase, from Kambong Batu to Putrajaya Sentral, was opened on March 16, 2023, completing the entire line. The entire route, from Kwasa Damansara to Putrajaya Sentral, is 57.7 kilometers long and has 36 stations. It connects major areas such as Sri Damansara, Sentul, Tun Razak Exchange, Cyberjaya and Putrajaya.
Kuala Lumpur Rapid Rail Map 2026 SVG
Click to expand
Other Lines in Kuala Lumpur Rapid Rail
Frequently Asked Questions — MRT Putrajaya Line
MRT Putrajaya Line has 36 stations on the Kuala Lumpur Rapid Rail network.
MRT Putrajaya Line runs between Kwasa Damansara and Putrajaya Sentral.
MRT Putrajaya Line is approximately 57.7 km long.
MRT Putrajaya Line opened in 2022.
MRT Putrajaya Line is a Metro line operated under Kuala Lumpur Rapid Rail.
MRT Putrajaya Line is part of the Kuala Lumpur Rapid Rail transit network.