Line 2 Info
- Network Luoyang Subway
- Operation Started 2021
- Total Length 18.2 km
- Total Stations 15
Terminals
From
Erqiao Road
To
Balitang
Line 2 Overview
Line 2 of the Luoyang Metro opened on December 26, 2021, as the system's second line. It runs between Erqiao Road and Balitang. The line is 18.2 kilometers long and has 15 stations. It operates as a north-south route and connects major transportation hubs, including Luoyang Railway Station and Luoyang Longmen High-Speed Railway Station. It also interchanges with Line 1 at Jiefang Road Station.
Luoyang Subway Map 2026
Click to expand
Other Lines in Luoyang Subway
Frequently Asked Questions — Line 2
Line 2 has 15 stations on the Luoyang Subway network.
Line 2 runs between Erqiao Road and Balitang.
Line 2 is approximately 18.2 km long.
Line 2 opened in 2021.
Line 2 is a Metro line operated under Luoyang Subway.
Line 2 is part of the Luoyang Subway transit network.