Luoyang Subway logo
Metro 18.2 km

Line 2 Stations (0)

Erqiao Road
Mangling
Guohua Road
Luoyang Railway Station
Shachang Road
Jiefang Road
Mudan Bridge
Wenbo Park
Sui-Tang Botanical Garden
Sports Center
Citizens' Home
Kaiyuan Lake
Xingluo Lake
Longmen High-Speed Railway Station
Balitang

Line 2 Info

  • Network Luoyang Subway
  • Operation Started 2021
  • Total Length 18.2 km
  • Total Stations 15

Terminals

From Erqiao Road
To Balitang

Line 2 Overview

Line 2 of the Luoyang Metro opened on December 26, 2021, as the system's second line. It runs between Erqiao Road and Balitang. The line is 18.2 kilometers long and has 15 stations. It operates as a north-south route and connects major transportation hubs, including Luoyang Railway Station and Luoyang Longmen High-Speed ​​Railway Station. It also interchanges with Line 1 at Jiefang Road Station.

Luoyang Subway Map 2026

Luoyang Subway map
Click to expand

Other Lines in Luoyang Subway

Frequently Asked Questions — Line 2

Line 2 has 15 stations on the Luoyang Subway network.

Line 2 runs between Erqiao Road and Balitang.

Line 2 is approximately 18.2 km long.

Line 2 opened in 2021.

Line 2 is a Metro line operated under Luoyang Subway.

Line 2 is part of the Luoyang Subway transit network.