Line 1 Info
- Network Monterrey Metro
- Operation Started 1991
- Total Length 18.8 km
- Total Stations 19
Terminals
From
Talleres
To
Exposición
Line 1 Overview
Line 1 runs from Talleres Station to Exposición Station. The first phase of this line opened on April 25, 1991, and was extended in 2002. The line is 18.8 kilometers long and has 19 stations. It is the oldest and busiest line in the Monterrey Metro system. The line connects with Line 2 at Cuauhtémoc Station and Line 3 at Félix U. Gómez Station.
Monterrey Metro Map 2026
Click to expand
Other Lines in Monterrey Metro
Frequently Asked Questions — Line 1
Line 1 has 19 stations on the Monterrey Metro network.
Line 1 runs between Talleres and Exposición.
Line 1 is approximately 18.8 km long.
Line 1 opened in 1991.
Line 1 is a Metro line operated under Monterrey Metro.
Line 1 is part of the Monterrey Metro transit network.