Line 5 Info
- Network Ningbo Metro
- Operation Started 2021
- Total Length 27.6 km
- Total Stations 22
Terminals
From
Buzheng
To
Xingzhuang Road
Line 5 Overview
Line 5 of the Ningbo Rail Transit opened on December 28, 2021. It runs between Buzheng in western Yinzhou District and Luotuo Bridge in Zhenhai District. The line is approximately 27.5 kilometers long and has 22 stations in its main phase. Later sections from Line 3 Phase 2 have been incorporated into Line 5 operations for some time. It connects major interchanges such as Sanguantang (Line 2 Interchange) and other key transfer stations across the city's network. Future expansion plans will extend the line and form a loop.
Ningbo Metro Map 2026
Click to expand
Other Lines in Ningbo Metro
Frequently Asked Questions — Line 5
Line 5 has 22 stations on the Ningbo Metro network.
Line 5 runs between Buzheng and Xingzhuang Road.
Line 5 is approximately 27.6 km long.
Line 5 opened in 2021.
Line 5 is a Metro line operated under Ningbo Metro.
Line 5 is part of the Ningbo Metro transit network.