Line C Info
- Network Rome Metro
- Operation Started 2014
- Total Length 18.1 km
- Total Stations 25
Terminals
From
Venezia
To
Monte Compatri-Pantano
Line C Overview
Line C opened in phases. The first phase, between Monte Compatri-Pantano and Parco di Centocelle, opened on 9 November 2014. The second, from Parco di Centocelle to Lodi, opened on 29 June 2015. The third, from Lodi to San Giovanni, opened on 12 May 2018. The fourth, from San Giovanni to Colosseo, opened on 16 December 2025. The line runs from Monte Compatri-Pantano to Colosseo. Its planned full route is 21.2 km long and has 24 stations. It interchanges with Line B at Colosseo and with Line A at San Giovanni.
Rome Metro Map 2026
Click to expand
Other Lines in Rome Metro
Frequently Asked Questions — Line C
Line C has 25 stations on the Rome Metro network.
Line C runs between Venezia and Monte Compatri-Pantano.
Line C is approximately 18.1 km long.
Line C opened in 2014.
Line C is a Metro line operated under Rome Metro.
Line C is part of the Rome Metro transit network.