Rome Metro logo

Line C

Rome Metro
Metro 18.1 km

Line C Stations (0)

Venezia
Fori Imperiali-Colosseo B
Porta Metronia
San Giovanni A
Lodi
Pigneto
Malatesta
Teano
Gardenie
Mirti
Parco di Centocelle
Alessandrino
Torre Spaccata
Torre Maura
Giardinetti
Torrenova
Torre Angela
Torre Gaia
Grotte Celoni
Due Leoni-Fontana Candida
Borghesiana
Bolognetta
Finocchio
Graniti
Monte Compatri-Pantano

Line C Info

  • Network Rome Metro
  • Operation Started 2014
  • Total Length 18.1 km
  • Total Stations 25

Terminals

From Venezia
To Monte Compatri-Pantano

Line C Overview

Line C opened in phases. The first phase, between Monte Compatri-Pantano and Parco di Centocelle, opened on 9 November 2014. The second, from Parco di Centocelle to Lodi, opened on 29 June 2015. The third, from Lodi to San Giovanni, opened on 12 May 2018. The fourth, from San Giovanni to Colosseo, opened on 16 December 2025. The line runs from Monte Compatri-Pantano to Colosseo. Its planned full route is 21.2 km long and has 24 stations. It interchanges with Line B at Colosseo and with Line A at San Giovanni.

Rome Metro Map 2026

Rome Metro map
Click to expand

Frequently Asked Questions — Line C

Line C has 25 stations on the Rome Metro network.

Line C runs between Venezia and Monte Compatri-Pantano.

Line C is approximately 18.1 km long.

Line C opened in 2014.

Line C is a Metro line operated under Rome Metro.

Line C is part of the Rome Metro transit network.