Line 3 Info
- Network Suzhou Metro
- Operation Started 2019
- Total Length 45.2 km
- Total Stations 37
Terminals
From
Suzhou Xinqu Railway Station
To
Weiting
Line 3 Overview
Suzhou Metro Line 4 opened on April 15, 2017, between Longdaobang and Tongli. The line is developed as a Y-shaped route, consisting of a main line and a southwest branch. Its total length is approximately 41.5 km and it has 31 stations. It was constructed in a single main phase, with subsequent operational adjustments. The line provides interchange between Line 1, Line 2, Line 3, Line 5, and Line 11.
Suzhou Metro Map 2026
Click to expand
Other Lines in Suzhou Metro
Frequently Asked Questions — Line 3
Line 3 has 37 stations on the Suzhou Metro network.
Line 3 runs between Suzhou Xinqu Railway Station and Weiting.
Line 3 is approximately 45.2 km long.
Line 3 opened in 2019.
Line 3 is a Metro line operated under Suzhou Metro.
Line 3 is part of the Suzhou Metro transit network.