Line 5 Info
- Network Tianjin Metro
- Operation Started 2018
- Total Length 34.8 km
- Total Stations 28
Terminals
From
Beichenkejiyuanbei
To
Liqizhuangnan
Line 5 Overview
Tianjin Metro Line 5 was inaugurated on October 22, 2018. Its first phase opened on December 28, 2021, between Xiaojie and Xinxingcun, while the remaining middle section between Dongnanjiao and Xiaojie will open in 2024. The line is 36 kilometers long and has approximately 29 stations. It connects to several important lines, including Line 1, Line 2, Line 3, Line 5, and Line 6, creating numerous interchange points across the network.
Tianjin Metro Map 2026
Click to expand
Other Lines in Tianjin Metro
Frequently Asked Questions — Line 5
Line 5 has 28 stations on the Tianjin Metro network.
Line 5 runs between Beichenkejiyuanbei and Liqizhuangnan.
Line 5 is approximately 34.8 km long.
Line 5 opened in 2018.
Line 5 is a Metro line operated under Tianjin Metro.
Line 5 is part of the Tianjin Metro transit network.