Xuzhou Metro logo

Line 2

Xuzhou Metro
Metro 24.3 km

Line 2 Stations (0)

Keyunbei
Liwo
Jiulishan
Bentengdadao
Jiulonghu
Qingyunqiao
Pengchengguangchang
Hubushan
Jiangsu Normal University Yunlong Campus
Xuzhou Central Hospital
Huaita
Kejicheng
Qiligou
Baiguoyuan
Tuolongshan
Dalonghu
Municipal Administrative Center
Hanyuandadao
Xinyuandadao
Xinchengqudong

Line 2 Info

  • Network Xuzhou Metro
  • Operation Started 2020
  • Total Length 24.3 km
  • Total Stations 20

Terminals

From Keyunbei
To Xinchengqudong

Line 2 Overview

Line 2 is a rapid transit line of the Xuzhou Metro. Construction began in February 2016, and the line opened on November 28, 2020. It is 24.3 kilometers long and has 20 stations. It also provides interchange with Line 1 and Line 3, facilitating connectivity between Pengcheng Square and Xuzhou Railway Station.

Xuzhou Metro Map 2026

Xuzhou Metro map
Click to expand

Frequently Asked Questions — Line 2

Line 2 has 20 stations on the Xuzhou Metro network.

Line 2 runs between Keyunbei and Xinchengqudong.

Line 2 is approximately 24.3 km long.

Line 2 opened in 2020.

Line 2 is a Metro line operated under Xuzhou Metro.

Line 2 is part of the Xuzhou Metro transit network.