Line 3 Info
- Network Xuzhou Metro
- Operation Started 2021
- Total Length 18.1 km
- Total Stations 16
Terminals
From
Xiadian
To
Gaoxinqu'nan
Line 3 Overview
Line 3 is a rapid transit line of the Xuzhou Metro. The line was constructed in several phases, with Phase 1 opening on June 28, 2021. Phase 2 opening on December 3, 2024. It is 26 kilometers long and has 22 stations. It also connects to other metro lines at major interchange points, such as Xuzhou Railway Station (Line 1).
Xuzhou Metro Map 2026
Click to expand
Other Lines in Xuzhou Metro
Frequently Asked Questions — Line 3
Line 3 has 16 stations on the Xuzhou Metro network.
Line 3 runs between Xiadian and Gaoxinqu'nan.
Line 3 is approximately 18.1 km long.
Line 3 opened in 2021.
Line 3 is a Metro line operated under Xuzhou Metro.
Line 3 is part of the Xuzhou Metro transit network.