Chengjiao Line Info
- Network Zhengzhou Metro
- Operation Started 2017
- Total Length 40.8 km
- Total Stations 27
Terminals
From
Chang'an Lu Bei
To
Xuchangdong
Chengjiao Line Overview
The Chengjiao Line is a suburban metro line with a total length of 31.7 kilometers, starting from Nansihuan in Guancheng and ending at Xinzheng International Airport, with 14 stations. The line opened on January 12, 2017. It connects the city with Longhu Town, Zhengzhou Airport Economy Zone, and Zhengzhou Xinzheng International Airport. Trains on this line currently run with Line 2. Important interchange stations include Nansihuan (Line 2) and Guangxu North (Zhengxu Line).
Zhengzhou Metro Map 2026
Click to expand
Other Lines in Zhengzhou Metro
Frequently Asked Questions — Chengjiao Line
Chengjiao Line has 27 stations on the Zhengzhou Metro network.
Chengjiao Line runs between Chang'an Lu Bei and Xuchangdong.
Chengjiao Line is approximately 40.8 km long.
Chengjiao Line opened in 2017.
Chengjiao Line is a Metro line operated under Zhengzhou Metro.
Chengjiao Line is part of the Zhengzhou Metro transit network.