Line 2 Info
- Network Hangzhou Metro
- Operation Started 2014
- Total Length 43.3 km
- Total Stations 33
Terminals
From
Chaoyang
To
Liangzhu
Line 2 Overview
Line 2 began construction in phases between Chaoyang and Qianjiang Road on November 24, 2014, and through subsequent extensions, the entire route was completed by 2017. The 42.8-kilometer line, with 33 stations, forms a major corridor from northwest to southeast in Hangzhou. It passes through central Hangzhou and connects key interchange points such as Fengqi Road, Wulinmen, and Qianjiang Century City.
Hangzhou Metro Map 2026
Click to expand
Other Lines in Hangzhou Metro
Line 1
Xianghu ↔ Xiaoshan International Airport
Line 10
Yisheng Road ↔ Huanglong Sports Center
Line 16
Jiuzhou Street ↔ Nanhu
Line 19
Line 3
Wushanqiancun ↔ Xingqiao
Line 3
Shima ↔ Xingqiao
Line 4
Puyan ↔ Shuicheng Bridge
Line 5
Line 6
Line 6
Goujulong ↔ Shuangpu
Line 7
Wushan Square ↔ Jiangdong'er Road
Line 8
South Wenhai Road ↔ Xinwan Road
Frequently Asked Questions — Line 2
Line 2 has 33 stations on the Hangzhou Metro network.
Line 2 runs between Chaoyang and Liangzhu.
Line 2 is approximately 43.3 km long.
Line 2 opened in 2014.
Line 2 is a Metro line operated under Hangzhou Metro.
Line 2 is part of the Hangzhou Metro transit network.