Line 7 Info
- Network Hangzhou Metro
- Operation Started 2020
- Total Length 47.5 km
- Total Stations 24
Terminals
From
Wushan Square
To
Jiangdong'er Road
Line 7 Overview
Line 7 of the Hangzhou Metro began operating in phases on December 30, 2020, with the first phase operating between the Olympic Sports Center and Jiangdong'er Road. The entire line is scheduled to be completed in 2022 and now runs from Wushan Square to Jiangdong'er Road. It is approximately 47.5 kilometers long and has 24 stations. It includes important interchange stations such as the Olympic Sports Center, Citizen Center, and Jiangdong'er Road, and connects the city center with the eastern expansion areas and airport access roads.
Hangzhou Metro Map 2026
Click to expand
Other Lines in Hangzhou Metro
Frequently Asked Questions — Line 7
Line 7 has 24 stations on the Hangzhou Metro network.
Line 7 runs between Wushan Square and Jiangdong'er Road.
Line 7 is approximately 47.5 km long.
Line 7 opened in 2020.
Line 7 is a Metro line operated under Hangzhou Metro.
Line 7 is part of the Hangzhou Metro transit network.