Shenyang Metro logo
Metro 27.8 km

Line 1 Stations (0)

Shisanhaojie
Zhongyangdajie
Qihaojie
Sihaojie
Zhangshi
Kaifadadao
Yuhongguangchang
Yingbinlu
Zhonggongjie
Qigongjie
Baogongjie
Tiexiguangchang
Yunfengbeijie
Shenyangzhan
Taiyuanjie
Nanshichang
Qingniandajie
Huaiyuanmen
Zhongjie
Dongzhongjie
Pangjiangjie
Limingguangchang

Line 1 Info

  • Network Shenyang Metro
  • Operation Started 2010
  • Total Length 27.8 km
  • Total Stations 22

Terminals

From Shisanhaojie
To Limingguangchang

Line 1 Overview

Line 1 is Shenyang's first metro line, and construction began in November 2005. The first phase opened between Shisanhaojie and Limingguangchang on September 27, 2010. The line was later extended eastward to Shuangma on June 30, 2025. It is approximately 43.95 kilometers long and has a total of 32 stations. Major stations on the line include Shenyang Railway Station, Tiexi Square, Qingniandajie, Zhongjie, and Liming Square. The main interchange stations on the line include Shenyang Railway Station and Qingniandajie.

Shenyang Metro Map 2026

Shenyang Metro map
Click to expand

Frequently Asked Questions — Line 1

Line 1 has 22 stations on the Shenyang Metro network.

Line 1 runs between Shisanhaojie and Limingguangchang.

Line 1 is approximately 27.8 km long.

Line 1 opened in 2010.

Line 1 is a Metro line operated under Shenyang Metro.

Line 1 is part of the Shenyang Metro transit network.