Shenyang Metro logo
Metro 45.6 km

Line 2 Stations (0)

Putianlu
Puhelu
Renjiehugongyuan
Liaoningdaxue
Hangkonghangtiandaxue
Shifandaxue
Yixueyuan
Santaizi
Lingxi
Xinleyizhi
Beilinggongyuan
Zhongyiyaodaxue
Qishanlu
Shenyangbeizhan
Jinrongzhongxin
Shifuguangchang
Qingniandajie
Qingniangongyuan
Gongyezhanlanguan
Shitushuguan
Wulihe
Aotizhongxin
Yingpanjie
Shijidasha
Baitahelu
Quanyunlu
Shenbendajie
Shenzhongdajie
Shengbowuguan
Zhongyanggongyuan
Chuangxinyilu
Zonghebaoshuiqu
Taoxianjichang

Line 2 Info

  • Network Shenyang Metro
  • Operation Started 2012
  • Total Length 45.6 km
  • Total Stations 33

Terminals

From Putianlu
To Taoxianjichang

Line 2 Overview

Line 2 was inaugurated on January 9, 2012, between Santazi and Quanyunlu. It was later extended northward to Putianlu in 2013 and 2018, while a southern extension to Taoxian Airport opened on September 29, 2023. It now runs between Putianlu and Taoxian Airport. The line is 45.58 kilometers long and has a total of 33 stations. Major interchange stations include Qingniandajie, Shenyang North Railway Station, and the Olympic Sports Center.

Shenyang Metro Map 2026

Shenyang Metro map
Click to expand

Frequently Asked Questions — Line 2

Line 2 has 33 stations on the Shenyang Metro network.

Line 2 runs between Putianlu and Taoxianjichang.

Line 2 is approximately 45.6 km long.

Line 2 opened in 2012.

Line 2 is a Metro line operated under Shenyang Metro.

Line 2 is part of the Shenyang Metro transit network.