Shenzhen Metro logo
Metro 31.3 km

Line 4 Stations (0)

Futian Checkpoint
Fumin
Convention and Exhibition Center
Civic Center
Children's Palace
Lianhua North
Shangmeilin
Minle
Baishilong
Shenzhen North
Hongshan
Shangtang
Longsheng
Longhua
Qinghu
Qinghu North
Zhucun
Xikeng
Changhu
Guanlan
Songyuanxia
Mission Hills
Niuhu

Line 4 Info

  • Network Shenzhen Metro
  • Operation Started 2004
  • Total Length 31.3 km
  • Total Stations 23

Terminals

From Futian Checkpoint
To Niuhu

Line 4 Overview

Line 4 began operation in two main phases. The first phase opened on December 28, 2004, between Fumin and Children's Palace, and subsequent extensions were gradually completed, reaching Niuhu on October 28, 2020. The line is approximately 31.3 kilometers long and has 23 stations. It also connects major hubs such as Fujian Checkpoint, Shenzhen North Railway Station, and Hongshan.

Shenzhen Metro Map 2026

Shenzhen Metro map
Click to expand

Frequently Asked Questions — Line 4

Line 4 has 23 stations on the Shenzhen Metro network.

Line 4 runs between Futian Checkpoint and Niuhu.

Line 4 is approximately 31.3 km long.

Line 4 opened in 2004.

Line 4 is a Metro line operated under Shenzhen Metro.

Line 4 is part of the Shenzhen Metro transit network.