Line 4 Info
- Network Shenzhen Metro
- Operation Started 2004
- Total Length 31.3 km
- Total Stations 23
Terminals
From
Futian Checkpoint
To
Niuhu
Line 4 Overview
Line 4 began operation in two main phases. The first phase opened on December 28, 2004, between Fumin and Children's Palace, and subsequent extensions were gradually completed, reaching Niuhu on October 28, 2020. The line is approximately 31.3 kilometers long and has 23 stations. It also connects major hubs such as Fujian Checkpoint, Shenzhen North Railway Station, and Hongshan.
Shenzhen Metro Map 2026
Click to expand
Other Lines in Shenzhen Metro
Frequently Asked Questions — Line 4
Line 4 has 23 stations on the Shenzhen Metro network.
Line 4 runs between Futian Checkpoint and Niuhu.
Line 4 is approximately 31.3 km long.
Line 4 opened in 2004.
Line 4 is a Metro line operated under Shenzhen Metro.
Line 4 is part of the Shenzhen Metro transit network.