Line 6B Info
- Network Shenzhen Metro
- Operation Started 2022
- Total Length 6.1 km
- Total Stations 4
Terminals
From
SIAT
To
Guangming
Line 6B Overview
The Line 6 branch line opened on November 28, 2022, between Shenzhen Institute of Advanced Technology and Guangming, the first phase of the branch line. It was later expanded in phases, with the section from Guangming to Guangmingcheng opening on September 28, 2025. The line is 11 km long and has seven stations. It serves as a feeder line for the main Line 6 corridor.
Shenzhen Metro Map 2026
Click to expand
Other Lines in Shenzhen Metro
Frequently Asked Questions — Line 6B
Line 6B has 4 stations on the Shenzhen Metro network.
Line 6B runs between SIAT and Guangming.
Line 6B is approximately 6.1 km long.
Line 6B opened in 2022.
Line 6B is a Metro line operated under Shenzhen Metro.
Line 6B is part of the Shenzhen Metro transit network.