Toronto subway logo

Line 4 Sheppard

Toronto subway
Metro 5.5 km

Line 4 Sheppard Stations (0)

Sheppard-Yonge
Bayview
Bessarion
Leslie
Don Mills

Line 4 Sheppard Info

  • Network Toronto subway
  • Operation Started 2002
  • Total Length 5.5 km
  • Total Stations 5

Terminals

From Sheppard-Yonge
To Don Mills

Line 4 Sheppard Overview

Toronto subway Line 4 Sheppard opened on November 22, 2002. The line runs between Sheppard–Yonge and Don Mills, a distance of approximately 5.5 km and has five stations. It primarily serves North York and connects with Line 1 at Sheppard–Yonge, acting as a local feeder route rather than a citywide main route.

Toronto subway Map 2026

Toronto subway map
Click to expand

Frequently Asked Questions — Line 4 Sheppard

Line 4 Sheppard has 5 stations on the Toronto subway network.

Line 4 Sheppard runs between Sheppard-Yonge and Don Mills.

Line 4 Sheppard is approximately 5.5 km long.

Line 4 Sheppard opened in 2002.

Line 4 Sheppard is a Metro line operated under Toronto subway.

Line 4 Sheppard is part of the Toronto subway transit network.