Line 4 Sheppard Info
- Network Toronto subway
- Operation Started 2002
- Total Length 5.5 km
- Total Stations 5
Terminals
From
Sheppard-Yonge
To
Don Mills
Line 4 Sheppard Overview
Toronto subway Line 4 Sheppard opened on November 22, 2002. The line runs between Sheppard–Yonge and Don Mills, a distance of approximately 5.5 km and has five stations. It primarily serves North York and connects with Line 1 at Sheppard–Yonge, acting as a local feeder route rather than a citywide main route.
Toronto subway Map 2026
Click to expand
Other Lines in Toronto subway
Frequently Asked Questions — Line 4 Sheppard
Line 4 Sheppard has 5 stations on the Toronto subway network.
Line 4 Sheppard runs between Sheppard-Yonge and Don Mills.
Line 4 Sheppard is approximately 5.5 km long.
Line 4 Sheppard opened in 2002.
Line 4 Sheppard is a Metro line operated under Toronto subway.
Line 4 Sheppard is part of the Toronto subway transit network.