Expo Line Info
- Network Vancouver SkyTrain
- Operation Started 1985
- Total Length 36.4 km
- Total Stations 20
Terminals
From
Waterfront
To
King George
Expo Line Overview
The first phase of the Vancouver SkyTrain Expo Line, Waterfront-New Westminster, which is 21.4 km long and has 15 stations, opened to the public on December 11, 1985. The line was extended in phases to King George and Production Way-University, bringing its length to 28.6 km and 24 stations. It connects Downtown Vancouver to Burnaby, New Westminster, and Surrey and is the system's oldest and busiest line.
Vancouver SkyTrain Map 2026
Click to expand
Other Lines in Vancouver SkyTrain
Frequently Asked Questions — Expo Line
Expo Line has 20 stations on the Vancouver SkyTrain network.
Expo Line runs between Waterfront and King George.
Expo Line is approximately 36.4 km long.
Expo Line opened in 1985.
Expo Line is a Metro line operated under Vancouver SkyTrain.
Expo Line is part of the Vancouver SkyTrain transit network.