Millennium Line Info
- Network Vancouver SkyTrain
- Operation Started 2002
- Total Length 25.5 km
- Total Stations 17
Terminals
From
VCC–Clark
To
Lafarge Lake–Douglas
Millennium Line Overview
The Millennium Line opened in 2002, with the initial section from VCC–Clark to Commercial–Broadway. It was extended to Lafarge Lake–Douglas in several stages until 2016, and later extended further with the Evergreen Extension. The line is approximately 30 km long with 17 stations. It connects Burnaby, Coquitlam, and Vancouver and includes major interchange stations such as Commercial–Broadway and Lougheed Town Centre.
Vancouver SkyTrain Map 2026
Click to expand
Other Lines in Vancouver SkyTrain
Frequently Asked Questions — Millennium Line
Millennium Line has 17 stations on the Vancouver SkyTrain network.
Millennium Line runs between VCC–Clark and Lafarge Lake–Douglas.
Millennium Line is approximately 25.5 km long.
Millennium Line opened in 2002.
Millennium Line is a Metro line operated under Vancouver SkyTrain.
Millennium Line is part of the Vancouver SkyTrain transit network.