M4 Line Info
- Network Ankara Metro
- Operation Started 1905
- Total Length 12.5 km
- Total Stations 9
Terminals
From
Atatürk Kültür Merkezi
To
Gazino
M4 Line Overview
The first phase of the M4 line was opened on January 5, 2017, between Atatürk Kültür Merkezi and Shahidlar-Gazino. It was later extended to Kızılay on April 12, 2023. The line is 12.5 kilometers long and has 12 stations. At Kızılay station, it also provides interchange connections with the M1, M2, and Ankara, improving accessibility to the Ankara Metro network.
Ankara Metro Map 2026
Click to expand
Other Lines in Ankara Metro
Frequently Asked Questions — M4 Line
M4 Line has 9 stations on the Ankara Metro network.
M4 Line runs between Atatürk Kültür Merkezi and Gazino.
M4 Line is approximately 12.5 km long.
M4 Line opened in 1905.
M4 Line is a Metro line operated under Ankara Metro.
M4 Line is part of the Ankara Metro transit network.