Line 3 Info
- Network Hefei Metro
- Operation Started 2019
- Total Length 37.2 km
- Total Stations 41
Terminals
From
Xiangchenglu
To
Guanyi
Line 3 Overview
Line 3 of the Hefei Metro began construction in 2015 and opened on 26 December 2019, initially operating between Xiangchenglu and Xingfuba. It was later extended in 2023 up to Sheng Ertong Yiyuan Xinqu. The line is 48.5 kilometers long and serves around 45 stations.Line 3 has several important interchange stations, including Hefei Railway Station (Line 1), West Railway Station (Line 2), West Qilitang (Line 4), Haitang (Line 5) and Yilijing (Line 8).
Hefei Metro Map 2026
Click to expand
Other Lines in Hefei Metro
Frequently Asked Questions — Line 3
Line 3 has 41 stations on the Hefei Metro network.
Line 3 runs between Xiangchenglu and Guanyi.
Line 3 is approximately 37.2 km long.
Line 3 opened in 2019.
Line 3 is a Metro line operated under Hefei Metro.
Line 3 is part of the Hefei Metro transit network.