Line 6 Info
- Network Chongqing Metro
- Operation Started 2012
- Total Length 25.8 km
- Total Stations 13
Terminals
From
Lijia
To
Shaheba
Line 6 Overview
Line 6, known as the International Expo Line, opened on 28 September 2012 between Lijia and the International Expo Center North. The line currently consists of seven stations and is a 12-kilometer-long auxiliary line. The branch begins at Lijia Station, where it splits from the main Line 6, and ends at Shaheba Station.
Chongqing Metro Map 2026
Click to expand
Other Lines in Chongqing Metro
Jiangtiao Line
Tiaodeng ↔ Shengquansi
Line 0
Chongqing West Station ↔ Hualong
Line 1
Chaotianmen ↔ Bishan
Line 10
Wangjiazhuang ↔ Lanhualu
Line 18
Fuhualu ↔ Tiaodengnan
Line 2
Jiaochangkou ↔ Yudong
Line 3
Yudong ↔ Tongyuanju
Line 3
Line 4
Line 5
Line 6
Guangdianyuan ↔ Beibei
Line 9
Xinqiao ↔ Huashigou
Frequently Asked Questions — Line 6
Line 6 has 13 stations on the Chongqing Metro network.
Line 6 runs between Lijia and Shaheba.
Line 6 is approximately 25.8 km long.
Line 6 opened in 2012.
Line 6 is a Metro line operated under Chongqing Metro.
Line 6 is part of the Chongqing Metro transit network.