Chongqing Metro logo
Metro 48.7 km

Line 5 Stations (0)

Yuegangbeilu
Yuegang Ave.
Chunxuan Ave.
Central Park West
Lujiagou
Ganyue Ave.
Yuhegou
The EXPO Garden Center
Danhe
Huxiajie
Chongguang
Hemulu
Renhe
Xingfu Square
Ranjiaba
Dalongshan
Dashiba
Zhongshutuo
Hongyancun
Xietaizi
Shiqiaopu
Shixinlu
Bashan
Fengxilu
Chongqing West
Huayan Temple
Huachenglu
Banshan
Zhongliangshan
Jinjianlu
Huayan Center
Tiaodeng

Line 5 Info

  • Network Chongqing Metro
  • Operation Started 2017
  • Total Length 48.7 km
  • Total Stations 32

Terminals

From Yuegangbeilu
To Tiaodeng

Line 5 Overview

Chongqing Rail Transit Line 5 opened on December 28, 2017, running between Dashiba and Tiaodeng in its initial section. It is a heavy rail metro line serving northeast-southwest Chongqing, with later extensions increasing connectivity to several districts and providing interchange connections with Line 1, Line 4, Line 6, and Line 9.

Chongqing Metro Map 2026

Chongqing Metro map
Click to expand

Frequently Asked Questions — Line 5

Line 5 has 32 stations on the Chongqing Metro network.

Line 5 runs between Yuegangbeilu and Tiaodeng.

Line 5 is approximately 48.7 km long.

Line 5 opened in 2017.

Line 5 is a Metro line operated under Chongqing Metro.

Line 5 is part of the Chongqing Metro transit network.