Line 13 Info
- Network Guangzhou Metro
- Operation Started 2017
- Total Length 28.3 km
- Total Stations 11
Terminals
From
Yuzhu
To
Xinsha
Line 13 Overview
Line 10 began operations on June 29, 2025, with the initial section between Xilang and Yangtze East. The line is 17.2 kilometers long and currently has 12 stations. Construction of the line began in 2018 and is designed as a rapid transit corridor connecting the western and central parts of the city. Additional sections and integration with other routes are planned as part of future network development.
Guangzhou Metro Map 2026
Click to expand
Other Lines in Guangzhou Metro
APM Line
Canton Tower ↔ Guangzhou Women and Children's Medical Center
Line 1
Xilang ↔ Guangzhou East Railway Station
Line 14
Jiahewanggang ↔ Dongfeng
Line 14
Xinhe ↔ Zhenlong
Line 18
Xiancun ↔ Wanqingsha
Line 2
Guangzhou South Railway Station ↔ Jiahewanggang
Line 21
Yuancun ↔ Zengcheng Square
Line 22
Chentougang ↔ Panyu Square
Line 3
Panyu Square ↔ Airport North (Terminal 2)
Line 3
Panyu Square ↔ Tianhe Coach Terminal
Line 4
Nansha Passenger Port ↔ Haibang
Line 5
Frequently Asked Questions — Line 13
Line 13 has 11 stations on the Guangzhou Metro network.
Line 13 runs between Yuzhu and Xinsha.
Line 13 is approximately 28.3 km long.
Line 13 opened in 2017.
Line 13 is a Metro line operated under Guangzhou Metro.
Line 13 is part of the Guangzhou Metro transit network.