Line 18 Info
- Network Guangzhou Metro
- Operation Started 2021
- Total Length 58.3 km
- Total Stations 8
Terminals
From
Xiancun
To
Wanqingsha
Line 18 Overview
Line 18 is an express metro line in Guangzhou. The line is 58.3 kilometers long, with 8 stations, and runs from Wanqingsha in Nansha District to Xiankun in Tianhe District. Interchange stations include Modisha, Nancun Wanbo, and Panyu Square, with future extensions planned to further extend the route.
Guangzhou Metro Map 2026
Click to expand
Other Lines in Guangzhou Metro
APM Line
Canton Tower ↔ Haixinsha
Line 1
Xilang ↔ Guangzhou East Railway Station
Line 13
Yuzhu ↔ Xinsha
Line 14
Jiahewanggang ↔ Dongfeng
Line 14
Xinhe ↔ Zhenlong
Line 2
Guangzhou South Railway Station ↔ Jiahewanggang
Line 21
Yuancun ↔ Zengcheng Square
Line 22
Chentougang ↔ Panyu Square
Line 3
Panyu Square ↔ Airport North (Terminal 2)
Line 3
Panyu Square ↔ Tianhe Coach Terminal
Line 4
Nansha Passenger Port ↔ Haibang
Line 5
Frequently Asked Questions — Line 18
Line 18 has 8 stations on the Guangzhou Metro network.
Line 18 runs between Xiancun and Wanqingsha.
Line 18 is approximately 58.3 km long.
Line 18 opened in 2021.
Line 18 is a Metro line operated under Guangzhou Metro.
Line 18 is part of the Guangzhou Metro transit network.