Line 5 Info
- Network Guangzhou Metro
- Operation Started 2009
- Total Length 41.7 km
- Total Stations 30
Terminals
From
Jiaokou
To
Huangpu New Port
Line 5 Overview
Line 5 of the Guangzhou Metro runs from Liwan District to Huangpu District. It begins in Jiaokou and runs in a wide "∩" shape for 41.7 km, ending at Huangpu New Port. It first opened on 28 December 2009 between Jiaokou and Wenchong, and was later extended further eastward in December 2023. The line currently has approximately 30 stations and operates using a mix of underground and some elevated sections. It connects to several other metro lines, becoming an important interchange corridor.
Guangzhou Metro Map 2026
Click to expand
Other Lines in Guangzhou Metro
APM Line
Canton Tower ↔ Linhexi
Line 1
Xilang ↔ Guangzhou East Railway Station
Line 13
Yuzhu ↔ Xinsha
Line 14
Jiahewanggang ↔ Dongfeng
Line 14
Xinhe ↔ Zhenlong
Line 18
Xiancun ↔ Wanqingsha
Line 2
Guangzhou South Railway Station ↔ Jiahewanggang
Line 21
Yuancun ↔ Zengcheng Square
Line 22
Chentougang ↔ Panyu Square
Line 3
Panyu Square ↔ Airport North (Terminal 2)
Line 3
Panyu Square ↔ Tianhe Coach Terminal
Line 4
Nansha Passenger Port ↔ Haibang
Frequently Asked Questions — Line 5
Line 5 has 30 stations on the Guangzhou Metro network.
Line 5 runs between Jiaokou and Huangpu New Port.
Line 5 is approximately 41.7 km long.
Line 5 opened in 2009.
Line 5 is a Metro line operated under Guangzhou Metro.
Line 5 is part of the Guangzhou Metro transit network.