Line 4 Info
- Network Kunming Metro
- Operation Started 2020
- Total Length 43.4 km
- Total Stations 29
Terminals
From
Jinchuan Road
To
Kunming South Railway Station
Line 4 Overview
Line 4 of the Kunming Metro opened on September 23, 2020. It runs between Jinchuan Road and Kunming South Railway Station. The line is approximately 43.4 kilometers long and has a total of 29 stations. Construction of the line began around 2016, and it was developed as one of the main routes running through the city. It connects the northwest and southeast parts of Kunming and includes several interchange stations with other metro lines and railway connections at Kunming North and South stations.
Kunming Metro Map 2026
Click to expand
Other Lines in Kunming Metro
Frequently Asked Questions — Line 4
Line 4 has 29 stations on the Kunming Metro network.
Line 4 runs between Jinchuan Road and Kunming South Railway Station.
Line 4 is approximately 43.4 km long.
Line 4 opened in 2020.
Line 4 is a Metro line operated under Kunming Metro.
Line 4 is part of the Kunming Metro transit network.