Changping Line Info
- Network Beijing Subway
- Operation Started 2010
- Total Length 43.2 km
- Total Stations 20
Terminals
From
Changping Xishankou
To
Jimenqiao
Changping Line Overview
The first phase of the Changping Line opened on December 30, 2010, between Xi'erqi and Nanshao. The line was later extended northward in phases to Changping Shishankou, with the second phase opening on December 26, 2015. The southern extension toward central Beijing was completed in several sections between 2021 and 2024. It is 43.8 km long and has 20 stations. It runs through Changping District to northern Beijing, connecting to Line 13 and Line 8.
Beijing Subway Map 2026
Click to expand
Other Lines in Beijing Subway
Capital Airport Line
Beixinqiao ↔ 2 Hao Hangzhanlou (Terminal 2)
Daxing Airport Line
Lize Shangwuqu ↔ Daxing Jichang (Daxing Airport)
Fangshan Line
Dongguantounan ↔ Yancundong
Line 1 (Batong)
Fushouling ↔ Universal Resort
Line 10
Bagou ↔ Huoqiying
Line 11
Moshikou ↔ Xinshougang (Shougang Park)
Line 13
Xizhimen ↔ Dongzhimen
Line 14
Zhangguozhuang ↔ Caihuying
Line 15
Line 16
Line 17
Line 19
Ping'anli ↔ Xingong
Frequently Asked Questions — Changping Line
Changping Line has 20 stations on the Beijing Subway network.
Changping Line runs between Changping Xishankou and Jimenqiao.
Changping Line is approximately 43.2 km long.
Changping Line opened in 2010.
Changping Line is a Metro line operated under Beijing Subway.
Changping Line is part of the Beijing Subway transit network.